Plan last-mile delivery routes and stop density for a depot
Designs delivery zones, route counts, and dispatch rules for a last-mile depot based on stops, time windows, and vehicle capacity.
The prompt
Help me plan last-mile delivery routes for my depot.
Depot and area: [DEPOT LOCATION, AREA SERVED, URBAN / SUBURBAN / RURAL MIX]
Daily volume: [AVERAGE AND PEAK STOPS AND PACKAGES PER DAY, BY ZIP OR ZONE IF KNOWN]
Stop types: [residential, business, apartments, lockers, signature required, large items]
Time windows and cutoffs: [e.g. "business stops before noon", "all routes out by 9:00", "back by 19:00"]
Vehicles: [TYPE, CAPACITY IN PACKAGES OR CUBE, NUMBER AVAILABLE]
Driver rules: [shift length, breaks, hours limits, pay model]
Current performance: [stops per hour, stops per route, failed deliveries, on-time %, miles per route]
Routing tool: [routing software name or "manual"]
Work through:
1. Zoning: split the area into routes balanced by workload (stops and drive time), not just by stop count.
2. Number of routes needed on a normal day and at peak, with a buffer.
3. Load sequence for vans so the first stops are loaded last.
4. Rules for failed deliveries, redeliveries, and when to reroute.
5. How to handle peak: flex drivers, extra waves, pickup points.
6. KPIs: stops per hour, cost per stop, first-attempt success rate, on-time rate.
Return: a route plan table (Route | Zones | Expected stops | Drive time | Service time | Vehicle), a morning dispatch checklist, and 5 ways to raise stops per hour without pushing drivers to cut safety corners.
Use only my numbers; flag assumptions as [ASSUMPTION]. Keep plans within driver hours and break rules for my location.
Highlighted [brackets] are blanks to replace with your own details.
Fill in the blanks and use this promptMore Projects & Operations prompts
What to fill in
- DEPOT LOCATION, AREA SERVED, URBAN / SUBURBAN / RURAL MIX
- TYPE, CAPACITY IN PACKAGES OR CUBE, NUMBER AVAILABLE
- shift length, breaks, hours limits, pay model
- routing software name or "manual"
- ASSUMPTION
How this prompt is built
This prompt follows the RTF structure (Role, Task, Format). RTF tells the model who to be, what to do and what shape the answer should take. It is the quickest structure that still gives noticeably better results than a bare request.
Related prompts
- Write a project closure reportFormally closes a project: results vs. objectives, handover, open items, and lessons.
- Plan an event from start to finishTimelines, budgets, logistics, run-of-show, and checklists for work or personal events.
- Turn my project plan into an Excel task tracker with owners and dependenciesBreaks a project or plan into a task tracker with owners, dates, dependencies, and status columns you can paste into Excel.
- Turn my team's updates into a weekly RAG status reportPulls scattered team updates into a weekly status report with honest red-amber-green ratings, risks, and asks.