ThinkWithPrompt by SynotticThinkWithPrompt

Capture lessons learned from a project

A blameless lessons-learned write-up with actions for next time.

Projects & OperationsRCTFStandardAnalyzePlanFill-in Template

The prompt

Role: Act as a PMO analyst capturing lessons learned from a completed project or phase. Context: Project summary and outcome vs plan: [PROJECT_SUMMARY]. Inputs (retro notes, review findings, RAID history, stakeholder feedback): [INPUTS]. The knowledge base structure and tags: [KB_STRUCTURE]. Audience who would reuse this: [AUDIENCE]. Task: Produce: 6-10 lessons, each as - situation, what happened, why (root cause), the impact, the recommendation for future projects, and the type of project/phase it applies to; group them (estimation, stakeholders, delivery, procurement, etc.); add the KB tags; and list the 3 lessons most worth turning into a checklist item or template change. Format: Sections: Lessons (grouped, each with the 6 fields) | KB tags | Turn-into-standard candidates.

Highlighted [brackets] are blanks to replace with your own details.

Fill in the blanks and use this promptMore Projects & Operations prompts

What to fill in

  • PROJECT_SUMMARY
  • INPUTS
  • KB_STRUCTURE
  • AUDIENCE

How this prompt is built

This prompt follows the RCTF structure (Role, Context, Task, Format). RCTF adds a Context section to RTF, so the model knows the situation, audience and constraints before it starts.

Related prompts

Find more prompts like this