Build a line-item estimate and bid for a construction job

A structured estimate with quantities, labor hours, materials, markup, contingency, and a bid summary you can check before submitting.

SalesFew-ShotStandardFinanceFill-in Template

The prompt

Help me build an estimate and bid for a construction job. Job and trade: [e.g. "tenant fit-out, electrical only", "bathroom remodel, GC"] Plans, specs, or site walk notes: [PASTE SCOPE NOTES, SHEET NUMBERS, SPEC SECTIONS] Quantities from my takeoff: [ITEMS AND QUANTITIES - e.g. "42 duplex receptacles", "180 LF 3/4 in. PEX"] Labor rates and crew: [LOADED HOURLY RATES, CREW SIZE, PREVAILING WAGE OR NOT] Material pricing I have: [SUPPLIER QUOTES - or "none yet"] Overhead, profit, and contingency targets: [e.g. "12% OH, 10% profit, 5% contingency"] Bid due date and format: [LUMP SUM / UNIT PRICE / T&M NOT-TO-EXCEED] Steps: 1. Organize the scope into cost codes or CSI divisions and flag anything in my notes with no quantity. 2. Build line items: quantity, unit, material cost, labor hours (state the labor unit you used), labor cost, equipment, subcontractor. 3. Add general conditions: supervision, permits, dumpsters, temp power, mobilization, cleanup, insurance and bond if required. 4. Apply overhead, profit, and contingency separately so I can see each. 5. Run a sanity check: cost per square foot or per fixture against the ranges I give you, and call out lines that look light. Rules: - Never invent prices or labor units. Where I have not given a number, show [ADD PRICE] or [CONFIRM LABOR UNIT]. - Separate alternates and allowances from the base bid. Return: the line-item table, a one-page bid summary, a list of assumptions, and a draft inclusions/exclusions list to attach to the bid.

Highlighted [brackets] are blanks to replace with your own details.

Fill in the blanks and use this promptMore Sales prompts

What to fill in

  • PASTE SCOPE NOTES, SHEET NUMBERS, SPEC SECTIONS
  • LOADED HOURLY RATES, CREW SIZE, PREVAILING WAGE OR NOT
  • SUPPLIER QUOTES - or "none yet"
  • e.g. "12% OH, 10% profit, 5% contingency"
  • LUMP SUM / UNIT PRICE / T&M NOT-TO-EXCEED
  • ADD PRICE
  • CONFIRM LABOR UNIT

How this prompt is built

This prompt follows the Few-Shot structure (Few-shot prompting). A few-shot prompt includes one or more worked examples of the input and the output you want, so the model can copy the pattern instead of guessing it.

Related prompts

Find more prompts like this