# Cut machine changeover time with a SMED plan

A step-by-step SMED analysis that separates internal and external setup work and gives a plan to shorten changeovers.

- Topic: Projects & Operations
- Framework: Few-Shot
- Level: Advanced
- Tags: Plan, Fill-in Template
- Source: https://www.thinkwithprompt.com/prompts/cut-machine-changeover-time-with-a-smed-plan

## Prompt

```text
Help me reduce changeover time on a machine using SMED (single-minute exchange of die).

**Machine and product change:** [e.g. "injection molding press 7, switching between part A and part B"]
**Current changeover time:** [last good part to first good part, in minutes]
**Changeover steps as observed:** [LIST each step with its duration and who does it; a video timing sheet is ideal]
**Changeovers per week:** [NUMBER]
**Constraints:** [crane availability, number of setup techs, safety rules, budget for quick-change hardware]
**Goal:** [target time, or what the freed-up time would be used for, e.g. "smaller batches" or "more capacity"]

Work through the SMED stages:
1. Classify each step as internal (machine must be stopped) or external (can be done while the machine runs). Flag steps that are currently internal but could be external: fetching tools, dies, material, and paperwork; preheating; pre-staging.
2. Suggest how to convert internal steps to external (setup carts, checklists, pre-set tools, preheating molds).
3. Suggest how to shorten remaining internal steps: quick-release clamps, standardized die heights, locating pins, fewer bolts, parallel work with two people, eliminating adjustments and trial runs.
4. Address the first-good-part phase: what causes adjustments and scrap after restart, and how to set parameters right the first time.

Return:
- A table: Step | Time | Internal/external now | Proposed | Improvement idea | Estimated time saved | Cost (low/medium/high).
- The new estimated changeover time, flagged as an estimate.
- A standard changeover checklist draft.
- The capacity or batch-size benefit, calculated from my numbers.

Apply lockout/tagout and safe die handling rules to every proposed change. Do not invent step times.
```

## What to fill in

- last good part to first good part, in minutes
- NUMBER

Free to copy and use. From ThinkWithPrompt (https://www.thinkwithprompt.com/), a library of 2,663 curated AI prompts.
